Search Results
Search results for "Erie Coke"
583 results found for "Erie Coke"
- Allegheny County Health Department Issues $918K Penalty to U.S. Steel for Uncontrolled Pushes at Clairton Coke Works
Some necessary background: Pushing is generally the operation by which coke that has completed the coking where the coke is cooled with water. During normal operation of the coke oven batteries 13, 14, 15, 19 and 20 at the Clairton Coke Plant, of the coking cycle for that oven. mass from the oven, dropping of coke into the hot car, or partial combustion of coke due to the high
- GASP to Board of Health: More Needs to Be Done to Alert Residents During Industrial Emergencies
Steel’s Clairton Coke Works left the community reeling, and while the Allegheny County Health Department Steel’s Clairton Coke Works.
- GASP Joins ACCAN, Community, in Celebration of 10 Years of Cleaner Air Following Shenango Coke Works Closure
Wednesday for a reunion event celebrating a decade of cleaner air since the closure of the Shenango Coke “In our nearly 60-year history, our work related to the Shenango Coke Works is among GASP’s most impactful
- UPDATED: U.S. Steel Appeal of Clairton Coke Works Title V Operating Permit Dismissed
challenge mounted by the company in recent weeks related to air quality regulation at the Clairton Coke
- A Change in Air Quality After the Closure of the Shenango Coke Plant
Since the DTE Energy Shenango Coke Plant ended production in January, air pollution from the battery The Shenango coke battery operated for 54 years. Less than a month later, DTE Energy announced plans to shut down the Shenango coke battery, blaming a downturn in the U.S. steel industry and a reduced demand for coke. I told my husband that the coke ovens must be off already.”
- OSHA Fines U.S. Steel $118K for Safety Violations Following Deadly August Explosion at Clairton Coke Works
Steel $118,000 for safety violations stemming from the deadly August explosion at the Clairton Coke Works
- BREAKING: Allegheny County Health Department Investigating Breakdown at U.S. Steel Clairton Coke Works
Steel's Clairton Coke Works facility last night, as well as elevated concentrations of both hydrogen Here is the statement: Statement from ACHD on US Steel's Clairton Coke Works Breakdown PITTSBURGH – Last The reports indicate there was elevated sulfur levels in coke oven gas while repairs took place within As a result, the gas produced during coke-making - called coke oven gas - was only partly cleaned by Steel’s Clairton coking facility.” Despite U.S.
- ACHD: Allegheny County Air Quality Alert Level Increases to Code Maroon; DEP Issues Code Purple for Friday
inform the public that the PM2.5 air quality conditions for Thursday, July 16 are currently in the Code Code Maroon (Hazardous) indicates that: Health warning of emergency conditions: everyone is more likely Code Purple (Very Unhealthy): Sensitive groups: Avoid all physical activity outdoors. PM 2.5 is a type of particle pollution comes from many different sources. Fine particles (2.5 micrometers in diameter and smaller) come from power plants, industrial processes
- Shenango Coke: Air Quality Compliance Issues Continue
We recently checked up on Shenango Inc.’s compliance with limitations on the sulfur content of its coke oven gas, visible emissions from the door areas of its coke ovens, and visible emissions from its battery Shenango reported no violations of the limitation on the sulfur content of its coke oven gas during the only one violation of a limitation that prohibits visible emissions from more than five percent of the coke ShenangoCokeWorks #NevilleIsland #emissions #combustionstack #AlleghenyCountyHealthDepartment #ACHD #cokeovengas
- EPA Wants to Revise Coke Oven Emissions Standards, But Not Enough to Address Unacceptable Risks
Environmental Protection Agency (EPA) this summer proposed policy revisions that will impact coke-making Steel’s Clairton Coke Works and Cleveland Cliffs’ coke ovens in Monessen. sources within those facilities: First, the NESHAPs for Coke Oven Batteries were promulgated in 1993 Second, the NESHAPs for Coke Ovens: Pushing, Quenching, and Battery Stacks were promulgated in 2003. Three Revisions That Could Most Impact Clairton, Monessen Mills First, EPA will require all coke-making







